Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Apr 21, 2022     Push Rods       Category: Flight Controls
Started on Section 39 Control System... First steps are to measure and cut the Pushrod Tubes, installation the Threaded Rod End. I measured the Pushrod Tubes and cut them to length then drilled the Threaded Rod Ends for Safety Wire and Riveting. Drilling the Threaded Rod End for the Safety Wire holes was a little tricky, as I had to drill on a slanted surface. I found that if I just went very slow to start the hole, it worked well. After that it was no issue. I primed the exterior of the pushrods prior to final installation mainly for cosmetics. The plans have you remove the F-1035 Battery/ Bellcrank Mount to install the F-1090 Elevator Pushrod Assembly by feeding it forward through the aft side of the F-1006 Fuselage Bulkhead and into the position. Arrgggh... I had already mounted the Pitch and Yaw servos with the aft F-1091Elevator Pushrod. Got that done now assembling the F-1063 Elevator Idler Arm Assembly.


 